Skill-Up

Skill-Up helps physiotherapists and physical coaches create and share training, prehabilitation and rehabilitation programmes. Patients and athletes follow exercises at home with instructional videos, while professionals track their progress.

  • Mobile
Product Type
Desktop & mobile exercise platform
Industry
Physiotherapy & physical coaching
Timeframe
2019
Role
Product strategy, UX & UI design
Scope
Product strategy, Stakeholder meetings, UX prototyping, Usability & user testing, UI design & deliverables
A person using the Skill-Up exercise programme interface on a tablet, with a video player and anatomical exercise illustrations.

The challenge.

Therapists and patients needed different things from the same platform. The project required aligning those perspectives while making programme creation, home exercise and progress tracking intuitive on desktop and mobile.

The key decision.

We brought stakeholder reviews and prototype testing into the design process. Testing the app ourselves helped us understand both sides of the experience and refine the interface around their needs.

The rejected option & why.

The first prototype was not treated as the final design. Features were reviewed and challenged through stakeholder meetings and testing before the interface was refined.

The outcome.

The platform supports therapists sharing exercise programmes and tracking patient progress, with a more streamlined experience across desktop and mobile.

The final verdict.

Aligning stakeholder expectations was central to the work. Repeated testing connected professional workflows with an approachable exercise experience for patients at home.

Facing the same challenges?

Every case here came down to one decision that was hard to undo. Book a 30-minute product review. I’ll look at your product and tell you which decision matters most right now.

Get in touch today